whatsapp

+86 135 2661 5783

whatsapp

market@doinggroup.com

Reform of cassava starch procesing line

Date:November 30, 2015/ Industry news/ Chat online

cassava starch production line

As we all know, CASSAVA starch is the main constituent of cassava. About 25% starch may be realized from mature and good quality tubers. About 60% starch may be obtained from dry cassava chips and about 10% dry pulp may be realized per 100 kg of cassava of roots.

The following are flow introduction of CASSAVA STARCH PROCESSING LINE.

1 Fresh cassava roots are washed to free foreign matters and peeled mechanically.

2 Then they are fed into raspers along with water for pulping, followed by filtration to separate starch so released during pulping. The residue is finely ground in plate mills to release residual starch from the pulp. 3 It is then filtered in a multistage fiber washing system to recover starch from the pulp.

4 The stream containing starch is put through centrifugal separators or the tabling system to eliminate fine fiber from starch.

5 The starch is filtered/centrifuged and finally the starch cake is dried in a flash dryer, packed and then marketed.

6 The pulp is dewatered in a screen press, dried in a flash dryer and sold for animal feed.

 

CONTACT US

DOING company offers cassava processing machine from single machine to the complete production line. If you want to get more details about cassava processing machine, please contact us:

  • Do you want to buy machine?
  • Yes, I want to buy machine
  • No, I Just learning
  • What is your raw material?
  • Cassava
  • Potato
  • Sweet potato
  • Others
  • 2. What is the final product you want to produce?
  • Garri
  • Cassava flour
  • Cassava starch
  • Cassava chips
  • Attiekie
  • Bammy
  • Others
  • 3.What is your capacity plan?
  • Small scale garri machine
  • 1ton per day
  • 2tons per day
  • 3tons per day
  • 10tons per day
  • 20tons per day
  • Others
  • 3.What is your capacity plan?
  • Small scale
  • 5tons per day
  • 10tons per day
  • 20tons per day
  • 50tons per day
  • 100tons per day
  • Others
  • 3.What is your capacity plan?
  • Small scale
  • 5tons per day
  • 10tons per day
  • 20tons per day
  • 50tons per day
  • 100tons per day
  • 200tons per day
  • 300tons per day
  • Others
  • 3.What is your capacity plan?
  • Small scale
  • Middle type
  • Large scale
  • What is your capacity plan?
  • Small scale
  • 5tons per day
  • 10tons per day
  • 20tons per day
  • 50tons per day
  • 100tons per day
  • 200tons per day
  • 300tons per day
  • Others

Name

Country

E-mail*

Tel/Whatsapp*

Inquiry